St. Mary Hoo C.E.G.B. Railway
Monday, July 11, 2011
A few more details added to the DMBS plus the chassis has now been weathered. The front brake rod should be lower but I had problems drilling out the fragile plastic of the Bachmann side frames. The unit runs very smoothly now.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)